Installing the Devimat
1. Draw up a plan of the room and
calculate the free fl oor area.
Use the plan to work out how to
lay the mat evenly across the
oor and show the location of the
cold tail (where the mat starts),
oor sensor and connection box.
The Devimat
should laid avoiding all fl oor
obstructions and close fl oor fi tting objects like pipes,
baths and cupboards. It is acceptable to lay the
devimat under suspended cupboards and wash
basins.
2. Mark the positions of the fl oor fi tting objects that
will be installed once the fl oor is fi nished, so
when laying the mat these can be avoided.
3. Each mat is supplied with a piece of 10mm
exible tubing (only one tube is required for each
thermostat), this is for the fl oor sensor, so that in
the unlikely event that the sensor fails, it can be
easily removed and
replaced without lifting the fl oor.
In some situations a small channel may have to be
made in the fl oor to accommodate the tubing. If so,
cut a channel from the thermostat position
approximately 20-30cm across the fl oor.
It is important that the
channel is positioned such
that it lays between two
heating wires and not across
them and not above heating
pipes below the fl oor. The
4. The existing oor
should be prepared as normally
required for tiling, this may
include cleaning and
removing all loose particles,
removing any sharp
protrusions that may cause
damage to the heating wire,
priming the fl oor surface and
bracing a timber fl oor with WBP
ply-for professional guidance refer to your adhesive
manufacturers recommendations.
end of the tubing in the fl oor
is sealed with tape to prevent
adhesive entering the tube.